Day 21 | Pocket Door

Day 21

Today Kevin hung the pocket door and main door in our bedroom. He also laid the black subway tile transition between the bedroom and bathroom. Looks like he is going to need to add an inch of trim around the pocket door frame because it is a hair too small. My mom continued to strip off the paint on door #1.

Black subway tiled used to transition between the existing bathroom tile and new carpet.

Black subway tiled used to transition between the existing bathroom tile and eventual carpet.


HELPERS: Mom U. and Jason